Yesterday Was #5 with 4 to go. The end of this chemo marathon is near!
OK. So here are the much anticipated (well maybe not so much).......OK the much asked about pictures of our remodel project. We actually planned this project before Sheri was diagnosed. After a few months of sitting around looking at each other in the evenings.....well lets just say I got bored. We did: All new doors throughout the house with new moldings and lock hardware. We gutted the master bath and installed a new walk in shower, with river rock tile floor (no it doesn't hurt your feet, it feels cool!). We painted and reused the cabinets and installed two sinks and new counter tops and back splash in the master (we had one sink before). In the guest bath we replaced the counter tops, back splash, sink and faucet. There's new paint in both baths. Not bad for two months, and minimal interruptions to life. We actually enjoy this stuff, it's not that stressful to us. I know it's hard to believe. Anyway, there it is, enjoy it for what it is. We will!
New Doors! Cherry Shaker
Guest Bath
Just after the old shower was ripped out
During Construction
River Rock Tile Floor
Master Shower
Master Vanity
Friday, April 11, 2008
Subscribe to:
Post Comments (Atom)
1 comment:
Absolutely gorgeous master bathroom! I would love to have that! I do enjoy your new look.
Post a Comment